| Code | Items | Parameters |
|---|---|---|
| 1 | Robot Cell (FANUC) | M20iD/35 |
| 2 | Sand Belt Machine | 1421*1625*2385mm |
| 3 | Cloth wheel polishing machine | 1000*1500*2200mm |
| 4 | Double-layers feeding table | Double-layers feeding table |
| 5 | Fixture | 400 mm |
| 6 | Max. Power of sand belt machine | 16 KW |
| 7 | Max. Power of cloth wheel polishing machine | 17.5 KW |
| 8 | Machine base | - |
| 9 | Voltage | 380V |
| 10 | Sand Belt specification | 4000MM/2500MM |
| 11 | Max. Liner speed of grinding | 29M/S |
| 12 | Max. Liner speed of polishing | 45M/S |
| 13 | Three-phase induction motor | 3KW-4P (1440r/min) |
| 14 | Air Pressure | 0.4~0.7Mpa |
| 15 | Machine size | 2400*3800*2700mm |
| 16 | Total Weight | 4000KG |
| 17 | Air cylinder | AirTAC |
| 18 | Bearing | NSK |
| 19 | Open guide slide block | LSPB |
| 20 | Open linear guide | LSPB |
| 21 | Three-phase induction motor | Planet |
| 22 | HMI | Delta |
| 23 | PLC | Delta |
| 24 | Cloth wheels dimension | Dia. 600; The width can be customized. |
| Code | Items | Details | Remarks |
|---|---|---|---|
| 1 | Machine warranty | 12 months | - |
| 2 | Service response time | Within 24 hours | - |
| 3 | Installation and Commissioning Fees at End User Site |
• Within 10 days included • Over 10 days: USD 200 per day and per person plus travel costs and accommodation • Translator cost will be paid by end user, additional travel costs, meals, accommodation |
- |
Important Purchase Information
The machine is widely used in metal casting production for manufacturing faucets, automobile spare parts, locks, door handles, Zamak handles, door hinges, aluminum handles, and various automotive components like bumpers, supports, bars, and wheel rims.
The equipment operates at a voltage of 380V and requires an air pressure of 0.4 to 0.7 Mpa. The maximum power of the sand belt machine is 16 KW, and the cloth wheel polishing machine has a maximum power of 17.5 KW.
We offer a 12-month machinery warranty. The technical support service response time is guaranteed within 24 hours. Additionally, installation and commissioning service at the end-user site is included if completed within 10 days.
The standard delivery time is 90 days after the contract is confirmed. Payment terms require a 50% TT deposit upon signing the contract, with the remaining 50% TT payment due prior to delivery.
Yes, each standard package is randomly attached with 1 set of fixtures, buffs, and polishing wax to facilitate initial operation and setup.