| Items | Parameters |
|---|---|
| Dimensions (L*W*H) | 4000 * 3400 * 3000 mm |
| Machine Power | 35 kW |
| Rated Voltage | 380 V |
| Max. Diameter of polishing wheel | 600 mm |
| Min. Diameter of polishing wheel | 400 mm |
| X-Axis travel | 1000 mm |
| Y-Axis travel | 900 mm |
| Z-Axis travel | 700 mm |
| U-Axis travel | ±90° |
| V-Axis travel | ±360° |
| W-Axis travel | ±720° |
| Program specifications | Either 500 lines 50 polishing programs, or 200 lines 125 polishing programs. |
| Polishing Wax compatibility | Solid Compound or Liquid |
| Code | Items | Details | Remarks |
|---|---|---|---|
| 1 | Machine warranty | 12 months | - |
| 2 | Service response time | Within 24 hours | - |
| 3 | Installation & Commissioning at End User Site |
• Within 10 days: included • Over 10 days: USD 200 per day per person plus travel costs and accommodation • Translator cost paid by end user, along with travel, meals, and accommodation. |
- |
The machine is designed to grind, polish, and debur a wide range of hardware components, including faucets, door locks, door handles, Zamak handles, door hinges, aluminum handles, as well as automotive components such as bumpers, supports, bars, and wheel rims.
During the grinding process, the machine continuously detects the positions of the contact wheels. It automatically adjusts their positions in real time to fully compensate for any physical wheel wear or positional deviation, ensuring consistent finishing quality.
The system has overall dimensions of 4000 * 3400 * 3000 mm. It operates with a machine power of 35 kW and requires a rated voltage of 380 V.
The machine features offline programming software for automated grinding. The controller can store either 50 polishing programs of 500 lines or 125 polishing programs of 200 lines. Professional technical programming assistance is fully provided to optimize process efficiency.
We offer a robust 12-month machine warranty with a guaranteed service response time within 24 hours. On-site installation and commissioning are included for up to 10 days at the end-user facility.
The standard delivery timeline is 90 days after the contract is confirmed. Payment terms require a 50% TT deposit upon contract signing, and the remaining 50% TT payment settled prior to machine delivery.