China Robotic Grinding Polishing Machine for Metal Castings Automation Manufacturers, Supplier

The parting line deburring by sanding belt.

The grinding robot machine is automatically controlled by a industrial robot.

The grinding machine has several grinding touch wheels.

The machine has function of automatic position compensation.

Product Description

Process Video
Product Introduction
Industrial sand core shooting machine for metal casting production
Outstanding quality sand core shooting machine for the casting industry in metal casting production
Applications

Our solutions are widely applied in various sectors:

Faucets
Automobile spare parts
Locks and door handles, Zamak Handle, Door Hinges, Aluminum handles
Automotive components: bumpers, supports, bars, wheel rims
Application 1
Application 2
Application 3
Machine Layout
Layout 1
Layout 2
Layout 3
Layout 4
Layout 5
Technical Parameters
Code Items Parameters
1Robot Cell (FANUC)M20iD/35
2Sand Belt Machine1421*1625*2385mm
3Cloth wheel polishing machine1000**1500*2200mm
4Double-layers feeding tableDouble-layers feeding table
5Fixture400 mm
6Max. Power of sand belt machine16 KW
7Max. Power of cloth wheel polishing machine17.5 KW
9Voltage380V
10Sand Belt specification4000MM/2500MM
11Max. Liner speed of grinding29M/S
12Max. Liner speed of polishing45M/S
13Three-phase induction motor3KW-4P (1440r/min)
14Air Pressure0.4~0.7Mpa
15Machine size2400*3800*2700mm
16Total Weight4000KG
17Air cylinderAirTAC
18BearingNSK
19Open guide slide blockLSPB
20Open linear guideLSPB
22HMIDelta
23PLCDelta
24Cloth wheels dimensionDia. 600; Width customizable
Warranty and After-Sales Service
Code Items Details Remarks
1Machine warranty12 months
2Service response timeWithin 24 hours
3Installation/CommissioningIncluded within 10 days; Beyond 10 days: USD 200/day/person + costs
Important Notes
Random attached 1 set fixture, buffs, and polishing wax.
Payment terms: 50% TT deposit after contract is signed; 50% TT payment before delivery.
Delivery time: 90 days after contract is confirmed.
Company Overview

Established in 2016, our company is a global leader in intelligent manufacturing solutions specializing in low-pressure die casting, grinding, polishing, and automation systems. Core offerings include automatic LPDC machines, robotic cell grinding/polishing systems, CNC polishing equipment, and turnkey production lines.

With exports to 30+ countries including Turkey, India, Mexico, USA, and Southeast Asia, we partner with top global brands to empower manufacturers with safer, greener, and smarter production through proprietary technologies like dynamic pressure control and multi-axis robotic algorithms.

With 50+ patents and a 60+ R&D team, we drive innovations in low-pressure casting and robotic automation. We deliver end-to-end solutions—from mold design to lean factory layouts—backed by 24/7 global support and localized service centers.

Facility Overview
Workshop & Team
Workshop 1
Workshop 2
Team 1
Project Cases
Case 1
Case 2
Case 3
Exhibitions & Certificates
Exhibition
Certificate 1
Certificate 2
Packing & Delivery
Packing 1
Packing 2
Packing 3
Frequently Asked Questions
Q1: What is the warranty period for the machinery?
A1: All machines come with a standard 12-month warranty covering manufacturing defects and core components.
Q2: What industries can benefit from your grinding and polishing systems?
A2: Our equipment is ideal for faucets, automotive components, door hardware, water meters, and any precision metal casting applications.
Q3: How fast is the technical support response?
A3: We guarantee a service response time within 24 hours to ensure minimal downtime for your production line.
Q4: What are the standard payment terms?
A4: Our typical terms are a 50% TT deposit upon contract signing and the remaining 50% TT payment before delivery.
Q5: Does the machine come with necessary accessories?
A5: Yes, each machine includes one set of fixtures, buffs, and polishing wax as part of the standard package.
Q6: What is the average lead time for equipment delivery?
A6: The standard delivery time is approximately 90 days following the confirmation of the contract.

Related Products