China High-Yield High Precision CNC Grinder Robot Revolutionizes Industrial Automation Processes Manufacturer, Exporter

The parting line deburring by sanding belt.

The grinding robot machine is automatically controlled by a industrial robot.

The grinding machine has several grinding touch wheels.

The machine has function of automatic position compensation.

Product Description

Process Video

i

Product Introduction

Industrial sand core shooting machine for metal casting production

Outstanding quality sand core shooting machine for the casting industry in metal casting production.

Applications

  • Faucets
  • Automobile spare parts
  • Locks and door handles, Zamak Handle, Door Hinges, Aluminum handles
  • Automotive components: bumpers, supports, bars, wheel rims
Application 1
Application 2
Application 3

Machine Layout

Layout 1
Layout 2
Layout 3
Layout 4
Layout 5
📋

Technical Parameters

Code Items Parameters
1Robot Cell (FANUC)M20iD/35
2Sand Belt Machine1421*1625*2385mm
3Cloth wheel polishing machine1000**1500*2200mm
4Double-layers feeding tableDouble-layers feeding table
5Fixture400 mm
6Max. Power of sand belt machine16 KW
7Max. Power of cloth wheel polishing machine17.5 KW
8Machine base-
9Voltage380V
10Sand Belt specification4000MM/2500MM
11Max. Liner speed of grinding29M/S
12Max. Liner speed of polishing45M/S
13Three-phase induction motor3KW-4P (1440r/min)
14Air Pressure0.4~0.7Mpa
15Machine size2400*3800*2700mm
16Total Weight4000KG
17Air cylinderAirTAC
18BearingNSK
19Open guide slide blockLSPB
20Open linear guideLSPB
21Three-phase induction motorPlanet
22HMIDelta
23PLCDelta
24Cloth wheels dimensionDia. 600; Custom width

Warranty and After-Sales

Code Items Details Remarks
1Machine warranty12 months-
2Service response timeWithin 24 hours-
3Installation and CommissioningWithin 10 days included; Over 10 days: USD 200/day per person + costsTranslator by user
!

Important Notes

1. Random attached 1set fixture, buffs, and polishing wax.

2. Payment terms: 50% TT deposit; 50% TT payment before delivery.

3. Delivery time: 90 days after contract confirmation.

🏢

About Our Company

Established in 2016, our company is a global leader in intelligent manufacturing solutions specializing in low-pressure die casting, grinding, polishing, and automation systems. Our core offerings include automatic LPDC machines, robotic cell grinding/polishing systems, CNC polishing equipment, and turnkey production lines.

With exports to 30+ countries and partnerships with top global brands, we empower manufacturers with safer, greener, and smarter production through proprietary technologies like dynamic pressure control and multi-axis robotic algorithms.

Our R&D team drives innovations in robotic automation, delivering end-to-end solutions from mold design to lean factory layouts, backed by global support and localized service centers.

📷

Factory & Workshop

Workshop 1
Workshop 2
Workshop 3
💼

Project Cases

Case 1
Case 2
Case 3
Case 4
Case 5
Case 6
🏆

Exhibitions & Certificates

Cert 1
Cert 2
Cert 3
📦

Packing & Delivery

Packing 1
Packing 2
Packing 3
?

Frequently Asked Questions

Q1: What are the main applications for your core shooting machines?

A1: Our machines are widely used in casting production for faucets, automotive spare parts, locks, door handles, and various precision aluminum or metal components.

Q2: What is the standard warranty period for the machinery?

A2: We provide a 12-month machine warranty starting from the date of acceptance.

Q3: How quickly can you respond to technical service requests?

A3: We guarantee a service response within 24 hours to ensure minimal downtime for your production line.

Q4: Are installation and commissioning services included?

A4: Yes, installation and commissioning fees at the end-user site are included if the process is completed within 10 days.

Q5: Which brands of critical components do you use?

A5: We utilize high-quality components from world-class brands such as FANUC for robotic cells, NSK for bearings, and Delta for PLC/HMI systems.

Q6: What is the typical lead time for an order?

A6: The standard delivery time is approximately 90 days after the contract is confirmed and the deposit is received.

Related Products